|
1978 |
|
Condensate Recovery System with water preheater from boiler
waste gases. |
Image |
|
Development of Indegenous Recuperator.
|
| 1979 |
|
Conversion of oil Fired Boiler to Coal cum Wood
Firing. |
Image
|
|
Designing of 4-5 tonnes per hour BRHF.
|
| 1984 |
|
Supplied 12 BRHFs to one forging plant in
Gujrat, with all new concepts.Achieving 30% savings. |
Image
|
|
|
| 1985
|
|
Retrofitted a 100 sq.
metre surface area for VISL, Bhadravati, Karnataka with indegenous
materials and designs.
Introduction of IIP- ENCON film
burner which is an icon in
international industry now.
|
Image
|
| 1986
|
|
Constructed one- third
super structure area of RCF, Kapurthala. Project directly under
surveillance of Hon. Rajiv Gandhi. |
|
|
|
|
|
|
|
More
Landmarks |
|
|
|
|
|
Next |